Level Best Concrete Flooring are nearing completion on a major industrial dilapidation scheme in Avonmouth, Bristol. The scheme has been ongoing for six months with Level Best carrying out their all encompassing Floor Renovation System on behalf of another repeat Client and Contractor.
Full scope of works in Avonmouth, Bristol has involved; joint arris breakdown repairs, structural core drill bolt removal and filling, localised patch repairing, Level Best’s very own heavy-duty joint repair system and completed with the revolutionary diamond polishing system.
Level Best are due to finish onsite in Avonmouth, Bristol before the end of the month, when the Yorkshire-based industrial concrete flooring specialist will mobilise to Heathrow, London to showcase the Floor Renovation System to another major European industrial warehouse Developer. Please revisit the website in the coming weeks for updates on both Bristol and London refurbishment dilapidation schemes.