Level Best Concrete Flooring were contracted by a repeat London-based contractor to carry out the full design supply and construction of an industrial concrete floor slab as part of a strategically located speculative development in North London.
Level Best’s in-house design team designed a 175mm steel reinforced industrial slab to accommodate the client’s specified speculative loadings. Construction issue drawings were issued to the client’s team prior to works starting onsite.
The all-encompassing industrial concrete flooring service was rolled out in Tottenham, North London starting with final regulating stone trimming to an accurate tolerance and slab preparation including steel joint erect ion prior to laser screed slab installation to FM2 surface tolerance.
The successful completion of this contract in Tottenham, North London was Level Best’s latest successful handover in the capital. Level Best will now mobilise to Yorkshire to carry out industrial concrete floor slabs in Sheffield, Bradford and Wakefield.