This new warehouse constructed at Melemerby Industrial estate on the outskirts of Ripon, North Yorkshire required a high tolerance industrial concrete floor slab. Details of this concrete floor slab are listed below:
Installer- Level Best Concrete Flooring
Design- JPG
Concrete supplier- Low Grange
Construction joints- RCR
Curing agent- Pics Eco cure
Floor joints – Level Best with Instant Seal
Laser screed – Somero SRS 4 with Ligchine Screedsaver as stand by
Powerfloats- Multiquip and Husqvarna ride on floats
Flatness tolerance – TR34 latest edition FM2
Area- 25,000 square feet
Install period- 1 day mezzanine and 2 days ground floor warehouse
Total duration- 2 days preparation, 3 days slab casting