Modern large bay laser screed design and construction methodology was showcased recently in Mansfield, Nottinghamshire by Level Best Concrete Flooring. TR34 design and construction methodology was adopted by Level Best working on behalf of a Lincolnshire-based long-standing repeat client contractor. This method of construction allows:

  • Daily practical volume outputs to be increased
  • Increased economies of scale
  • Improved quality
  • Reduced costs
  • Reduced programme.

Level Best are able to provide this modern construction solution to clients, contractors and end-users due to the Yorkshire-based company’s commitment to investing in the latest most innovative concrete flooring technologies, such as the contractor’s recent purchase of a laser screed.

Large bay laser screed services enable Level Best to place approximately 1500 square metres of concrete warehouse floor per day whilst maintaining flatness control. The warehouse floor specification of a FM2 flatness classification as directed by The Concrete Society’s Technical Report 34 document was achieved and exceeded in Mansfield, Nottinghamshire.

All 6,000 square metres of industrial warehouse flooring was levelled, compacted and placed utilising flood pour laser screed technology and techniques. The daywork panels were formed with permanent steel armoured high-tensile daywork joints providing arris armouring at floor level and load-transfer at mid-depth of slab. Steel fabric mesh reinforcement was installed on a progressive just-in-time basis by Level Best’s steel fixing operatives. Finally, a full powerfloat surface finish was provided in Mansfield, Nottinghamshire with a curing and sealing agent spray-applied to aid surface curing and future anti-dusting.