Level Best Concrete Flooring is pleased to announce its appointment to deliver a specialist Joint-Free Flooring (JFF) system for a new waste recycling facility in Rotherham, South Yorkshire.
The project has been secured with a long-established South Yorkshire-based waste management company, which was looking for a long-term concrete flooring solution to overcome the challenges associated with traditionally constructed floors.
The facility owner raised concerns around ongoing maintenance, floor durability and the potential for operational downtime caused by deteriorating concrete joints. In response, Level Best proposed its innovative Joint-Free Flooring system, designed to eliminate problematic joints and provide a more resilient, long-lasting working surface.
Joint-Free Flooring is particularly suited to demanding environments such as waste recycling centres, material recovery facilities and waste transfer stations, where heavy machinery, constant vehicle movements and abrasive materials can place significant stress on concrete floors.
By removing the need for traditional construction joints, the system helps reduce maintenance requirements, minimise disruption and improve the long-term performance of the floor, delivering significant benefits for waste management operators.
Work is scheduled to commence onsite in Rotherham in December 2026, with Level Best looking forward to delivering another specialist industrial concrete flooring solution for the waste and recycling sector.
Planning a new waste recycling facility or experiencing problems with your existing concrete floor? Contact Level Best Concrete Flooring to discover how our Joint-Free Flooring systems can help reduce maintenance and keep your operations moving.