Internal and external concrete slab removal and replacement experts Level Best Concrete Flooring have commenced the next phase of industrial repair works on the Daventry International Rail Freight Terminal in Daventry, Northamptonshire.
The ongoing works include; full depth slab saw cutting, full depth slab removal and offsite disposal, load-transfer drilling and dowelling and finally heavy-duty mesh reinforced slab installation. All slab removal and reinstatement works are carried out in house by Level Best to ensure quality and programme are constantly achieved.
Yorkshire-based Level Best Concrete Flooring work and liaise closely with the Landlord and insitu tenant to ensure that repairs works are carried out in the right areas at the right time of year to avoid disruption to the tenant’s functions and outputs. The key part of minimising disruption is through an initial inspection and survey with the Client.
Full depth external service yard slab removal and replacement works will continue over the next couple of weeks in Daventry, Northamptonshire.