Contact Us
01405 819199
Toggle navigation
Home
About Us
Meet our Team
Environmental Social Governance Agenda
Frequently Asked Questions
Testimonials
Privacy Policy
Our Services
Floor Renovation System (F.R.S)
Internal Concrete Flooring
External Concrete Flooring
Repairs, Removal and Replacement
Sub Base Levelling
Joint Free Concrete Flooring
Case Studies
Latest News
Contact Us
4. If steel permanent construction joints are required, they are installed prior to the concrete being cast. Existing doorway floor slabs are dowelled at the designed centres to create the load transfer between the concrete floors.