Level Best Concrete Flooring construct a cast insitu laser screed concrete floor slab and achieve the flatness tolerance of FM1 as per TR34 4th edition 2013

Level Best Concrete Flooring the Goole based laser screed concrete flooring contractors, constantly strive to achieve very high tolerances when constructing cast insitu concrete floor slabs. As you can see from the floor level survey carried out by an independent specialist, this concrete floor slab in Melton Mowbray has been laid to the standard set by the Concrete Societies  4th edition of Tr34 2013 edition. The concrete floor was laid using the Somero S – 940 laser screed and the concrete flooring contractors experienced team and subsequently rectified whilst concrete in the “plastic state” by the two teams of concrete finishers using “bump cutters” measuring devices and powerfloats.

Should you have the need for an industrial concrete floor slab to be laid to high tolerances, then please feel free to discuss your project with one of our estimating team at Level Best on 01405 819199 or alternatively email enquiries@levelbestconcreteflooring.co.uk

180620 FFC171 FM1 Floor Survey rev 0

Comments are closed.